    红层泥质砂岩隧道进口段注浆加固及效果评价

    Grouting reinforcement and effect evaluation of the inlet section of a red-layer shaly sandstone tunnel

    • 摘要: 以江西某红层软岩隧道为背景对注浆加固进行分析。该隧道进口段的围岩揭示为破碎程度高、完整性差、地下水发育。在考虑工程实际的基础上, 确定以小导管预注浆和全断面径向注浆为主的注浆加固方案。依据理论和经验公式确定相关的注浆参数。通过现场监测对注浆效果进行了详细评价。监测结果表明:注浆在衬砌外部形成了较为稳定的注浆圈, 降低了围岩的遇水软化程度, 提高了围岩强度, 减小了围岩的渗透系数, 拱顶沉降及围岩收敛最终趋于稳定。隧道右边墙围岩破碎程度高, 同时拱顶围岩注浆效果欠佳, 建议施工中加强对右边墙和拱顶的支护。

       

      Abstract: In this paper, a red layer soft rock tunnel project in Jiangxi is used to analyze the grouting reinforcement. The surrounding rock of the entrance section of the tunnel is characterized by high fragmentation, poor integrity and abundant groundwater. On the basis of consideration of engineering practice, a grouting reinforcement scheme with the small pipe pre grouting and full section radial grouting is determined. According to theory and empirical formula, the relevant grouting parameters are determined. Through the field monitoring, the grouting effect is evaluated in detail. The monitoring results show that the grouting forms a relatively stable grouting ring outside the lining, which reduces the water softening degree of the surrounding rock, improves the strength of the surrounding rock and reduces the coefficient of permeability of the surrounding rock. Finally, the vault settlement and surrounding rock convergence eventually tend to be stable. The surrounding rock of the right wall has a higher degree of fragmentation, and the grouting effect of the vault surrounding rock is poor. Therefore it is suggested that the support of the right wall and vault is strengthened.

       

    /

    返回文章
    返回